top of page


Reduce Cost and Schedule by Developing an Optimum Well Surface Facility Program
Cathy Farina presented her Reduce Cost and Schedule by Developing an Optimum Well Surface Facility Program paper virtually at the 2020...

DyCat Solutions
Nov 9, 20203 min read
Â
Â


Utilizing Lean Design Methods to Reduce Overall Lifecycle Costs for Heavy Industrial Projects
Executing industrial capital projects has proven to be high risk in not meeting the project business objectives. As projects increase in...

DyCat Solutions
Sep 14, 20208 min read
Â
Â


Maintain Worker Health and Safety While Improving Productivity Utilizing Modularization Methods
Posted July 2020 COVID-19 has had a major impact on all industries including the heavy industrial construction sector. Some suggest the...

DyCat Solutions
Jul 29, 20203 min read
Â
Â


Collaboration is Crucial to the Success of a Capital Projects when Introducing New Approaches
Process facility owners or Engineering, Procurement and Construction (EPC) companies are traditionally structured in a vertical...

DyCat Solutions
Jul 23, 20204 min read
Â
Â


How to ensure your modularization project is a success!
Industrial Modularization has become the main execution method for many facility owners as it has been proven on a global basis to reduce...

DyCat Solutions
May 24, 20206 min read
Â
Â
bottom of page


